। Geographical Condition of America (United States) > 1. Basic Political & General Information Official Name:  United States of America Capital:   Washington, D.C. Number of States:  50 states Currency:  US Dollar (USD) National Language:  No official federal language; English is most widely spoken Other Languages:  Spanish, Chinese, Tagalog, French, German, etc. 2. Location and Boundaries The  United States  is located in  North America . Geographical Position Latitudes: 24°N to 49°N Longitudes: 66°W to 125°W Borders North:  Canada South:  Mexico East:   Atlantic Ocean West:   Pacific Ocean Southeast:   Gulf of Mexico Northwest (Alaska):   Arctic Ocean 3. Area and Size Total Area:  9,833,520 sq km Land Area:  9,147,420 sq km Water Area:  685,100 sq km It is the  3rd largest country  in the world (after Russia and Canada). 4. Physical Features & Relief The USA has very diverse...

Building construction planning in civil engineering





Introduction:-

 Construction planning  refers to  thinking about  all the operation or  activities , which are  necessary  to prior to the  begining of actual  construction  project . this job  planning  is essential  to complete  the project  within the stipulated  time and  to achieve  construction  economy . It is also  involves anticipitation of various  uncertain  activities  or event . Which  are likely  to cause  delay, so that  precautionary  measure  can  we taken  well in advance  to compensate  for the loss of time . For a contractor  planning is essential  prior to building  a project  because  proper  planning  will only  reveal  certain  factor , Which  will affects  the  cost  of the project  and help  him to show the amount  in the bids .

What is construction planning :-

 It  is define as  systematic  arrangement  or oder lly  establishment  of all the construction  activities before  starting  actual  construction work on a project . The main objectives  of construction  planning  is to complete  the project  economically  in a satisfactory  manner  and  within  the  stipulated  time .

* The exact  time of delivery  of construction  material like  aggregate , sand  , cement  steel etc. 

* The type , quantity  and duration  of  construction  equipment  required.

* Number  of skilled  and  unskilled  worker  needed and the period  during  which  they will  be needed .

* THe extent  upto  which  the  finances  are required .

*  The time requirement to complete  the project.

*  First aid is also needed on construction sites

Advantage of  construction  planning ;-

*  The main objectives  of construction  planning is to excute  the project  at lowest  practical  cost  and  within  the  scheduled time.

* Prior construction  planning  is essential for a  contractor  for  successful  bidding  as it help  to estimates  the probable  cost  of project  before hand  in the absence  of any planning  the construction  job would be a  big gamble.

*Construction planning  helps the contractor  to determine  the quantity , type  and  exact  time for delivery  of  material  absence  of planning  will lead  to  unwanted  stucking  of material  at the site , Which  may likely  to get  damaged  or stolen 

* It  helps to determine  the type , number  and duration  of different  types  of construction  equipment  required  at tthe site.

*  One of the important  objectives  of construction planning  is to divide  the whole  project  into number of events  or phases.

*  Construction planning helps to  the contractor  to successfully utilise  all the  available  resources  of the construction  such as Men , material ,machine.

* To determine skilled or unskilled  labour  for work on site .

Stage  of construction  planning :-

* Pre- tender stage :-  The planning of various  construction  activities  required  between the notification  inviting  tends  and the  submission  of bid  by  the contractor is termed as  pretender planning ..

* Contract stage \ post tender stage :-  This stage is also  known as  post  stage  It is the most importnt  stage of  planning as  execution  of the project  is based on  contract  planning.

*  To divide  the entire  project  into  different events  or phases.

*  To prepare  a master plan  for executing work  conveniently  and smoothy .

* To prepare charts  showing activities  of construction  for evaluating  progress of work.

* To prepare  labour charts  showing the number  of skilled or unskilled   labour .

*  To make necessary  arrangement  for repair , servicing , and maintenance  of plants , equipments  and machinery.

Comments

Popular posts from this blog

comparison between acid and base

What is tidal energy, advantage, disadvantage, challenges

What is magnetic flux , factors, physical significance, units and measurements, application